top of page

 PROVISION OF CONSTRUCTION AND COMMISSIONING FOR OIL TRAINS 3, 4 AND 5 FOR PCIHBV – CIVIL & ELECTROMECHANICAL WORKS

PROJECT NO:.PE17505AD-404

PEG Engineering & Contracting DMCC (in Consortium with CPECC) has been awarded the aforementioned Project by PETRONAS CARIGALI IRAQ Holding BV (hereafter referred to as PCIHBV) for the supply of n. 3 Crude Oil Processing Trains together with their associated facilities and other auxiliary systems for n. 3 Crude Oil Processing Trains located in Garraf Oil Field (Nassiria / IRAQ). 

In March 2019 Iraq Technology for General Contracting (ITC) was Subcontracted the scope of work consists in the civil, Mechincal and E&I work which include, structural foundations and underground works related to the following main Equipment/Prefabricated Assembled Unit and Utilities, Structural work , Piping,Pipe Racks, Skids assembly,equipements installation and all electrical and instruments wiring , testing and calibration which include but not limited to:

Train 3:

  • 1st Stage Separator

  • 2nd Stage separator

  • Crude Oil Heater

  • Crossovers/platforms and staircase

  • Crude Heater Fuel Gas Skid

  • Crude Charge Pumps Skids

  • Dehydrator Package

  • Wash Water Heat Exchanger Skid

  • Desalter Package

  • Wash Water Recirculation Pumps Skid

  • Crude Rundown Air Cooler

  • Shelters

 

Train 4:

  • 1st Stage Separator

  • 2nd Stage separator

  • Crude Oil Heater

  • Crossovers/platforms and staircase

  • Crude Heater Fuel Gas Skid

  • Crude Charge Pumps Skids

  • Dehydrator Package

  • Wash Water Heat Exchanger Skid

  • Desalter Package

  • Wash Water Recirculation Pumps Skid

  • Crude Rundown Air Cooler

  • Shelters

 

Train 3&4 - Common Utilities:

  • Fuel Gas Treatment Package (common for n. 3 Trains)

  • Miscellaneous Pipe Supports

  • Pipe rack for Train 3&4

  • Underground Fire Fighting Network

  • U/G Open drain and closed drain network

  • Site finishing (gravelling)

Train 5:

  • 1st Stage Separator

  • 2nd Stage separator

  • Crude Oil Heater

  • Crossovers/platforms and staircase

  • Crude Heater Fuel Gas Skid

  • Crude Charge Pumps Skids

  • Dehydrator Package

  • Wash Water Heat Exchanger Skid

  • Desalter Package

  • Wash Water Recirculation Pumps Skid Crude Rundown Air Cooler

  • Shelters

rain 5 - Utilities:

  • Common fuel gas package

  • Miscellaneous Pipe Supports

  • Pipe rack for Train 5

  • Fire Fighting Network (U/G and A/G)

  • U/G Open drain and closed drain network

  • Site finishing

The project Construction was completed in March 2022

bottom of page