PROVISION OF CONSTRUCTION AND COMMISSIONING FOR OIL TRAINS 3, 4 AND 5 FOR PCIHBV – CIVIL & ELECTROMECHANICAL WORKS
PROJECT NO:.PE17505AD-404
PEG Engineering & Contracting DMCC (in Consortium with CPECC) has been awarded the aforementioned Project by PETRONAS CARIGALI IRAQ Holding BV (hereafter referred to as PCIHBV) for the supply of n. 3 Crude Oil Processing Trains together with their associated facilities and other auxiliary systems for n. 3 Crude Oil Processing Trains located in Garraf Oil Field (Nassiria / IRAQ).
In March 2019 Iraq Technology for General Contracting (ITC) was Subcontracted the scope of work consists in the civil, Mechincal and E&I work which include, structural foundations and underground works related to the following main Equipment/Prefabricated Assembled Unit and Utilities, Structural work , Piping,Pipe Racks, Skids assembly,equipements installation and all electrical and instruments wiring , testing and calibration which include but not limited to:
Train 3:
-
1st Stage Separator
-
2nd Stage separator
-
Crude Oil Heater
-
Crossovers/platforms and staircase
-
Crude Heater Fuel Gas Skid
-
Crude Charge Pumps Skids
-
Dehydrator Package
-
Wash Water Heat Exchanger Skid
-
Desalter Package
-
Wash Water Recirculation Pumps Skid
-
Crude Rundown Air Cooler
-
Shelters
Train 4:
-
1st Stage Separator
-
2nd Stage separator
-
Crude Oil Heater
-
Crossovers/platforms and staircase
-
Crude Heater Fuel Gas Skid
-
Crude Charge Pumps Skids
-
Dehydrator Package
-
Wash Water Heat Exchanger Skid
-
Desalter Package
-
Wash Water Recirculation Pumps Skid
-
Crude Rundown Air Cooler
-
Shelters
Train 3&4 - Common Utilities:
-
Fuel Gas Treatment Package (common for n. 3 Trains)
-
Miscellaneous Pipe Supports
-
Pipe rack for Train 3&4
-
Underground Fire Fighting Network
-
U/G Open drain and closed drain network
-
Site finishing (gravelling)
Train 5:
-
1st Stage Separator
-
2nd Stage separator
-
Crude Oil Heater
-
Crossovers/platforms and staircase
-
Crude Heater Fuel Gas Skid
-
Crude Charge Pumps Skids
-
Dehydrator Package
-
Wash Water Heat Exchanger Skid
-
Desalter Package
-
Wash Water Recirculation Pumps Skid Crude Rundown Air Cooler
-
Shelters
rain 5 - Utilities:
-
Common fuel gas package
-
Miscellaneous Pipe Supports
-
Pipe rack for Train 5
-
Fire Fighting Network (U/G and A/G)
-
U/G Open drain and closed drain network
-
Site finishing
The project Construction was completed in March 2022